You have to take into account that with the five fleets operating and during this period over the next few months, the contractors will be targeting 25k t WHILST ALSO removing overburden. Thus they are able to increase production when areas no longer require overburden removal.
I'd bet that management have got a few aces up their sleeve with regards to logistics and production that will change the dynamics of the situation for the future. They are fully aware that they need to lower costs and increase production. In the meantime, we wait for the news flow...
- Forums
- ASX - By Stock
- Ann: Clarification Regarding Ramp up of Production
You have to take into account that with the five fleets...
- There are more pages in this discussion • 185 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CKA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.8¢ |
Change
0.001(1.03%) |
Mkt cap ! $104.6M |
Open | High | Low | Value | Volume |
9.7¢ | 9.9¢ | 9.7¢ | $19.65K | 199.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4346 | 9.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 4346 | 0.098 |
1 | 1328 | 0.097 |
2 | 110000 | 0.096 |
1 | 6518 | 0.092 |
1 | 20000 | 0.091 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 50000 | 1 |
0.105 | 211003 | 2 |
0.110 | 1081869 | 7 |
0.115 | 297704 | 4 |
0.120 | 505000 | 4 |
Last trade - 11.47am 12/06/2024 (20 minute delay) ? |
|
|||||
Last
9.8¢ |
  |
Change
0.001 ( 1.03 %) |
|||
Open | High | Low | Volume | ||
10.0¢ | 10.0¢ | 9.8¢ | 26705 | ||
Last updated 12.00pm 12/06/2024 ? |
Featured News
CKA (ASX) Chart |