TOR 2.44% 20.0¢ torque metals limited..

I was thinking the same , however I just can not see the logic...

  1. 33,354 Posts.
    lightbulb Created with Sketch. 1706
    I was thinking the same , however I just can not see the logic of next drilling out the Observation deposit by the drill contractor , as to me although shallow the strip ratio is likely to be very high on that deposit given how tabular the ore body is (not much vertical depth to give tonnage )

    One possibility would be a two stage pit , just to drill out to a very shallow 30 to 40meter depth , and then just mine down to 30 or 40 meters depth to reduce strip ratio and get some cashflow , then instead of doing a typical cut back do another infill drilling campaign from the pit floor for another excavation ?
    Obviously the contractor knows 1000 times what I do , so would love to know where I am wrong and the grade does look exceptional at first glance .
    What is good is from memory there is an ASX company that has its own CIL plant around Coolgardie that specialises in treating ore for juniors .
 
watchlist Created with Sketch. Add TOR (ASX) to my watchlist
(20min delay)
Last
20.0¢
Change
-0.005(2.44%)
Mkt cap ! $35.73M
Open High Low Value Volume
20.0¢ 20.0¢ 19.5¢ $44.00K 224.2K

Buyers (Bids)

No. Vol. Price($)
1 80000 20.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.5¢ 155294 2
View Market Depth
Last trade - 12.08pm 07/06/2024 (20 minute delay) ?
Last
20.0¢
  Change
-0.005 ( 2.56 %)
Open High Low Volume
19.5¢ 20.0¢ 19.5¢ 15568
Last updated 12.08pm 07/06/2024 ?
TOR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.