Ok let's not talk mining costs because there is a full feasibility study in place but where that study is dramatically wrong is in the profit margins , gold just hit $3700 which means if production targets are met then at $3700 this project will generate an extra $28 million a year and a safety buffer is now in place , if production was AROUND 20% short of projections the anticipated profits would still be met , this is a very nice position to be in . The Gold price in 6 months time is any ones guess , my guess is a continued firming , lets see what happens .
- Forums
- ASX - By Stock
- Ann: Paulsens Refurbishment Progress - April 2024
Ok let's not talk mining costs because there is a full...
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BC8 (ASX) to my watchlist
(20min delay)
|
|||||
Last
30.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $92.56M |
Open | High | Low | Value | Volume |
30.0¢ | 31.0¢ | 30.0¢ | $404.1K | 1.325M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 302510 | 30.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
31.0¢ | 9950 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 302510 | 0.300 |
4 | 231949 | 0.295 |
12 | 396316 | 0.290 |
8 | 388025 | 0.285 |
16 | 307980 | 0.280 |
Price($) | Vol. | No. |
---|---|---|
0.310 | 9950 | 1 |
0.315 | 18200 | 1 |
0.320 | 70000 | 2 |
0.325 | 36450 | 2 |
0.330 | 8100 | 1 |
Last trade - 16.10pm 05/06/2024 (20 minute delay) ? |
|
|||||
Last
30.5¢ |
  |
Change
0.000 ( 1.67 %) |
|||
Open | High | Low | Volume | ||
30.5¢ | 31.0¢ | 30.0¢ | 759955 | ||
Last updated 15.52pm 05/06/2024 ? |
Featured News
BC8 (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
Previous Video
Next Video
SPONSORED BY The Market Online