No Nuclear expert used, Used cost estimate for a single high cost Small Nuclear project.
Meeting notes saying large scale Nuclear is not suitable based on biassed anti nuclear types
Only included cost of a single high cost Small Nuclear project and not cost of transmission lines and total cost of solar, Wind, pumped hydro or other items included in the Gen Cost reports
https://www.csiro.au/en/research/technology-space/energy/Energy-data-modelling/GenCost
Honestly shocked to see our CSIRO shocking failures or deliberately misinforming us.
- Forums
- Political Debate
- Chris Bowen and CSIRO miss informed us
Chris Bowen and CSIRO miss informed us
- There are more pages in this discussion • 45 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
ATC
ALTECH BATTERIES LTD
Martin Stein, CFO
Martin Stein
CFO
Previous Video
Next Video
SPONSORED BY The Market Online