MAY 2.00% 5.1¢ melbana energy limited

Cuba Block 9: Operations Update 9 April 2024, page-3

  1. 342 Posts.
    lightbulb Created with Sketch. 58
    Forward plan is to run into hole with Bottom Hole Assembly and drill 8 ½” hole to section Total Depth prognosed at 3586 mMD.

    Can we assume that the TD quoted is only for the Alameda section and that they will continue to drill the next 300m into the Marti section as originally planned.

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.1¢
Change
0.001(2.00%)
Mkt cap ! $171.8M
Open High Low Value Volume
4.9¢ 5.1¢ 4.9¢ $143.6K 2.866M

Buyers (Bids)

No. Vol. Price($)
2 300000 5.1¢
 

Sellers (Offers)

Price($) Vol. No.
5.2¢ 196510 3
View Market Depth
Last trade - 15.00pm 14/05/2024 (20 minute delay) ?
Last
5.1¢
  Change
0.001 ( 2.00 %)
Open High Low Volume
5.0¢ 5.1¢ 4.9¢ 862287
Last updated 15.39pm 14/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.