ok, so the number of cranes working within a city, has been likened to an indicator of real property demand in the area. That said, often, the peak crane number occurs at a point in time, when peak property demand has already passed. This occurs because the lead time taken to secure sufficient pre sold apartments, and the time lag in financing, regulatory approvals, and design is slower than the demand response to changes in int rates etc. This phenomenon should not be confused with the number of cranes on an industrial construction site. They are not equivalent, given the driving forces are not equivalent.
- Forums
- ASX - By Stock
- Lynas, China and strategic rare earths
ok, so the number of cranes working within a city, has been...
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.54 |
Change
-0.020(0.30%) |
Mkt cap ! $6.113B |
Open | High | Low | Value | Volume |
$6.52 | $6.57 | $6.48 | $12.90M | 1.975M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1500 | $6.52 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.55 | 46167 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1500 | 6.520 |
3 | 3207 | 6.500 |
4 | 16295 | 6.490 |
6 | 42636 | 6.480 |
2 | 21975 | 6.470 |
Price($) | Vol. | No. |
---|---|---|
6.550 | 43504 | 4 |
6.560 | 13049 | 2 |
6.570 | 5000 | 1 |
6.580 | 7000 | 1 |
6.590 | 2000 | 2 |
Last trade - 16.10pm 12/06/2024 (20 minute delay) ? |
|
|||||
Last
$6.52 |
  |
Change
-0.020 ( 0.45 %) |
|||
Open | High | Low | Volume | ||
$6.52 | $6.56 | $6.48 | 8151421 | ||
Last updated 15.59pm 12/06/2024 ? |
Featured News
LYC (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham, CEO
James Graham
CEO
SPONSORED BY The Market Online