April 26 (Reuters) - Capricorn Metals Ltd (CMM) :
- MARCH QUARTER GOLD PRODUCTION OF 26,017 OUNCES AT KARLAWINDA GOLD PROJECT
- GOLD PRODUCTION FOR JUNE 2024 QUARTER IS EXPECTED TO BE IN RANGE OF 26,000 - 29,000 OUNCES FOR KGP OPERATIONS
- FY24 AISC GUIDANCE RANGE REMAINS UNCHANGED FOR KGP OPERATIONS
- SEES FY24 ANNUAL PRODUCTION OF 112,000 - 115,000 OUNCES. AT KARLAWINDA GOLD PROJECT
- Q3 ALL-IN-SUSTAINING-COST OF A$1,515 PER OUNCE FOR KGP OPERATIONS
(([email protected];))
- Forums
- ASX - By Stock
- News: CMM Capricorn Metals Posts Qtrly Gold Production Of 26,017 Ounces At Karlawinda Gold Project
April 26 (Reuters) - Capricorn Metals Ltd (CMM) : MARCH QUARTER...
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CMM (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.44 |
Change
-0.350(7.31%) |
Mkt cap ! $1.676B |
Open | High | Low | Value | Volume |
$4.55 | $4.57 | $4.42 | $7.863M | 1.760M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 10873 | $4.42 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.44 | 6908 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 5014 | 4.420 |
2 | 1320 | 4.410 |
10 | 34475 | 4.400 |
2 | 5442 | 4.390 |
2 | 3733 | 4.380 |
Price($) | Vol. | No. |
---|---|---|
4.450 | 3816 | 3 |
4.460 | 20487 | 4 |
4.470 | 3733 | 2 |
4.480 | 442 | 1 |
4.490 | 19913 | 4 |
Last trade - 16.10pm 11/06/2024 (20 minute delay) ? |
|
|||||
Last
$4.43 |
  |
Change
-0.350 ( 7.47 %) |
|||
Open | High | Low | Volume | ||
$4.55 | $4.57 | $4.42 | 242530 | ||
Last updated 15.59pm 11/06/2024 ? |
Featured News
CMM (ASX) Chart |