April 26 (Reuters) - Capricorn Metals Ltd (CMM) :
- MARCH QUARTER GOLD PRODUCTION OF 26,017 OUNCES AT KARLAWINDA GOLD PROJECT
- GOLD PRODUCTION FOR JUNE 2024 QUARTER IS EXPECTED TO BE IN RANGE OF 26,000 - 29,000 OUNCES FOR KGP OPERATIONS
- FY24 AISC GUIDANCE RANGE REMAINS UNCHANGED FOR KGP OPERATIONS
- SEES FY24 ANNUAL PRODUCTION OF 112,000 - 115,000 OUNCES. AT KARLAWINDA GOLD PROJECT
- Q3 ALL-IN-SUSTAINING-COST OF A$1,515 PER OUNCE FOR KGP OPERATIONS
(([email protected];))
- Forums
- ASX - By Stock
- News: CMM Capricorn Metals Posts Qtrly Gold Production Of 26,017 Ounces At Karlawinda Gold Project
April 26 (Reuters) - Capricorn Metals Ltd (CMM) : MARCH QUARTER...
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CMM (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.91 |
Change
0.150(3.15%) |
Mkt cap ! $1.868B |
Open | High | Low | Value | Volume |
$4.91 | $4.98 | $4.82 | $3.553M | 725.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 10000 | $4.91 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.92 | 3481 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 4619 | 4.930 |
15 | 14291 | 4.920 |
9 | 23223 | 4.910 |
11 | 10181 | 4.900 |
8 | 5683 | 4.890 |
Price($) | Vol. | No. |
---|---|---|
4.940 | 7086 | 17 |
4.950 | 14400 | 32 |
4.960 | 13948 | 26 |
4.970 | 13084 | 14 |
4.980 | 11764 | 13 |
Last trade - 14.34pm 20/05/2024 (20 minute delay) ? |
|
|||||
Last
$4.89 |
  |
Change
0.150 ( 2.85 %) |
|||
Open | High | Low | Volume | ||
$4.90 | $4.98 | $4.82 | 126397 | ||
Last updated 14.55pm 20/05/2024 ? |
Featured News
CMM (ASX) Chart |