Looked it up - Tully area? Yes, one would think a good whoaboy would be needed in that area. Excavator construction is best in my opinion, graders not the best for compaction and overall construction but it does depend on the operator too. Some of these renewable wind farm projects have had a free reign from an environmental controls perspective from what I have heard locally around Rockhampton.
- Forums
- Political Debate
- Queensland Labor destroys 100 klms of Great Dividing Range in CQ for 401 wind towers
Looked it up - Tully area? Yes, one would think a good whoaboy...
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)